A fair payment schedule pays the contractor as the work gets done, not before. Most landscaping jobs in Armstrong use a deposit, one or more progress payments, and a final payment after a walkthrough. Here is how each piece works, what to check before you pay, and how to keep records.
Why landscapers ask for a deposit
A deposit does two things. It holds your spot on the schedule, and it covers materials the contractor orders before the crew arrives. Pavers, wall block, trees, and irrigation parts often get ordered weeks ahead.
Ask what the deposit covers. A good answer names the materials and the booking. Ask what happens to the deposit if you cancel, or if the contractor cannot start in the agreed window. Get both answers in the contract.
Be cautious if a contractor asks for most of the job price up front. Materials are a part of the job, not all of it. A deposit that covers materials and a booking is normal. A deposit that covers the labor too is not.
What a payment schedule looks like
Payment schedules vary by job size. A small job may be a deposit and a final payment. A larger job splits the middle into stages. One common shape for a patio and planting project:
- Deposit at signing
- Payment after excavation and base are done and checked
- Payment after the pavers and edging are set
- Payment after planting and irrigation are finished
- Final payment after the walkthrough and any fixes
Each payment matches a stage of work you can see. You walk the site, confirm the stage is done, and then pay.
Ask the contractor to write the schedule into the contract, with the amount for each stage. If the contract only says “progress payments,” ask for the detail.
Tie payments to milestones, not dates
A schedule that says “payment on June 15” pays the contractor whether or not the work is done. A schedule that says “payment when the base is compacted and inspected” pays for progress.
Weather delays are common here. Spring thaw can be late and wet. Fall freeze can come early. A milestone schedule adjusts on its own. A date schedule does not.
If a contractor insists on dates, ask for a clause that moves each payment to the matching milestone if the work falls behind.
Holdbacks
A holdback is a part of the price you keep until the job is done and checked. It gives you a way to get small problems fixed without a fight.
Two kinds matter here.
The deficiency holdback. When the job is nearly done, you and the contractor walk the site and list anything that is not finished or not right. You hold back enough to cover those items. When they are fixed, you pay.
The lien holdback. British Columbia has a Builders Lien Act. It can apply to landscaping and hardscape work. It sets rules about a portion of the contract price that an owner holds for a set period, and about how subcontractors and suppliers can claim against a property if they are not paid. Whether it applies to your job, and how, depends on the contract and the work. Ask the contractor how they handle it. For a large job, ask a lawyer or a notary before you sign.
Write any holdback into the contract. A holdback you did not agree to in writing can become a dispute.
Before the final payment
The final payment is your last point of control. Do not rush it. Before you pay:
- Walk the whole site with the contractor. Check grades, edges, joints, plant placement, and cleanup.
- Run every irrigation zone and watch each head.
- Check that water runs away from the house everywhere.
- Compare what you see to the contract and the plan.
- Get the deficiency list fixed, or agree in writing on when it will be.
- Get the warranty terms in writing. See what a landscaping warranty covers.
- Get care instructions for new plants and sod.
- Ask for proof that subcontractors and suppliers were paid, if any were used.
- Collect the final invoice, with the tax shown.
If something is not right, say so before you pay, not after. Most contractors fix small things fast when a payment depends on it.
E-transfer or cheque: keep the record
How you pay matters less than the record it leaves. Every payment needs a paper trail that shows who you paid, how much, when, and for what.
E-transfer. Fast and common. The bank record shows the amount and the date. Before you send, check that the recipient name or email matches the business on your contract. Put the invoice number in the message field. Save the confirmation.
Cheque. Slower, but the cheque image is a clear record. Write it to the business name on the contract, not to a person. Note the invoice number on the memo line.
Credit card. Some contractors take cards. Some add a fee for it. A card gives you a dispute process if the job goes badly wrong.
Cash. Avoid it. If you must, get a signed receipt on the spot that names the business, the amount, the date, and the invoice it pays. A contractor who offers a discount for cash and no paperwork is a warning sign.
For every payment, get an invoice first. An invoice names the business, the date, what the payment is for, and the tax. Match each invoice to a stage in your schedule. Keep them in one folder with the contract.
Warning signs
Pause and ask more questions if you see any of these:
- A request for full payment, or nearly full payment, before work starts
- A request for a payment before the matching stage is done
- Pressure to pay cash or skip invoices
- A payment schedule that is not in the contract
- A refusal to walk the site before the final payment
- A second request for a deposit after the first, with no change order
For more, see red flags when hiring a landscaper.
What to do next
Before you sign, read the payment section of your contract line by line. Match every payment to a stage you can see and check. Add a deficiency holdback. Then read the landscaping contract checklist to review the rest of the agreement. For help planning the project itself, see landscape design.