Sod hides the ground under it for about two weeks. After that, the ground decides everything. A lawn laid on compacted subsoil, bad grades, or thin topsoil goes patchy in its first summer and stays that way. A lawn laid on loose, deep, well graded soil fills in and lasts. In Armstrong, where soil is often heavy and summers are dry, prep matters more than where the sod came from.
Clear the site
Start with a clean site. Remove the old lawn, weeds, rocks, roots, and construction debris. Old sod can be cut and lifted with a rented sod cutter, or killed and tilled in, though tilling leaves weed seeds and chunks that come back. Lifting is cleaner.
Dig out roots from any removed shrubs or trees. Pull out buried concrete, wire, and lumber. New homes in Armstrong and Spallumcheen often have a layer of construction fill near the foundation, and that fill grows a poor lawn.
Call BC 811 before you dig anywhere deep. The locate is free. Mark sprinkler lines, too, if you have them.
Fix the grade first
Grade means the slope of the ground. Water must run away from the house, not toward it. Set the grade before you add soil, because topsoil follows the shape of what is under it.
Walk the site after a rain and watch where water goes. Fill low spots that pool. Cut down humps. Slope the ground away from the foundation on every side. Keep the final soil surface a little below sidewalks, patios, and driveway edges so the sod sits level with them, not above.
If the yard has a wet area that never dries, fix the drainage before you sod. Sod on a wet spot rots. See how to grade a yard so water runs away from the house in Armstrong, BC and why water pools in Armstrong, BC yards and how to fix it.
Loosen the subsoil
Most Armstrong yards have compacted soil under the surface. Builders drive over it. Years of foot traffic pack it. Clay soils compact on their own when wet.
Grass roots cannot push into hard ground. They stay shallow, and shallow roots dry out in the first July heat wave. Loosen the subsoil before you add topsoil. A rototiller works for a small yard. A contractor may use a tractor or skid steer with a tiller or ripper. Break up the top layer so new roots and water can get down.
Do not work the soil when it is wet. Wet clay packs hard again and dries in lumps when tilled.
Add enough topsoil
Topsoil is where the roots live. Too little, and the lawn dries out fast and needs constant watering. The right depth depends on your soil, your grass, and your budget, so ask the contractor what depth they plan to spread and why. Compare the answer against other quotes.
Order screened topsoil, which has rocks and clumps removed. Ask where it comes from. Good topsoil is dark, crumbles in the hand, and has no strong smell. Topsoil mixed with compost holds water better in dry summers. On heavy clay, a sandy loam blend helps drainage. On sandy soil, more compost helps water stay put.
Spread the topsoil in an even layer. Rake it smooth. Fill low spots. Keep the grade running away from the house.
If your existing soil is good, you may only need to loosen it and add compost. A soil test from a local garden center or lab tells you what you have. For heavy soil, see how to prepare heavy soil for planting in Armstrong, BC.
Rake and level
Rake the whole area with a landscape rake. Pull the high spots into the low spots. Break up any clumps. Remove any rocks that surface. The goal is a smooth, even surface with no dips or ridges.
Sod shows every bump. A ridge in the soil becomes a scalped strip when you mow. A dip becomes a puddle. Take your time here. It is the last chance to fix the shape of the lawn.
Roll it lightly
A lawn roller is a drum you fill with water and pull across the soil. It settles the loose topsoil so it does not sink after the sod goes down. Roll once, with the drum partly filled. You want to firm the surface, not compact it. Footprints should still leave a shallow mark.
After rolling, rake out any low spots that appear and roll again lightly.
Add a starter fertilizer
Spread a starter fertilizer on the bare soil before the sod goes down, if the soil test calls for it. Rake it in lightly. Follow the label for the rate. Some Okanagan municipalities have rules on fertilizer near water, so check if your lot borders a creek or ditch.
Water the soil first
Dampen the prepared soil the day before sod arrives. Not soaked, just damp. Dry soil pulls water out of the sod roots. Damp soil lets the roots knit in right away.
Get the timing right
Sod can go down any time the ground is not frozen and the sod farm is cutting. In Armstrong that means spring through fall. Each season has a catch.
Spring sod has cool weather and rain on its side, but the soil may be too wet to prep well. Summer sod needs heavy watering in heat and smoke, and watering restrictions may apply. Fall sod roots well in cool soil and faces less weed pressure, but it needs time to root before the ground freezes. Many contractors prefer late summer to early fall for this reason.
Have the sod laid the day it arrives. Rolled sod on a pallet heats up and dies within a day or two in summer. Finish all prep before you order.
Lay it, roll it, water it
Lay the first row along a straight edge. Stagger the joints so seams do not line up. Butt the edges tight with no gaps and no overlaps. Cut around beds and paths with a sharp knife. Roll the finished lawn once to press the roots onto the soil. Then water right away, and keep watering on a schedule the contractor gives you.
Stay off the new lawn until it has rooted. Tug a corner. When it resists, it has taken.
What to ask a contractor
If you hire out the prep, ask these before you sign.
- How will you remove the old lawn?
- How will you set the grade, and where will water go?
- Will you loosen the subsoil, and with what?
- What topsoil will you bring in, what depth, and where is it from?
- Will you roll, and will you add starter fertilizer?
- Who waters in the first two weeks, and on what schedule?
Specific answers mean a crew that has done this before. Vague answers mean the prep gets skipped.
What to do next
Decide whether sod or seed suits your yard. See sod or seed for a new lawn in Armstrong, BC?. Then book the prep for a dry stretch and order the sod for the day prep is done. A lawn care contractor can handle grading, soil, and sod as one job. Ask for the spec in writing.