Armstrong Landscaping

Articles · Patios and walkways

How to fix a heaved or sunken paver patio in Armstrong, BC

Updated 2026-11-15

A heaved or sunken paver patio can almost always be fixed, and the pavers themselves are rarely the problem. The fix ranges from lifting a few pavers and adding bedding sand to tearing out the whole surface and rebuilding the base. The size of the job depends on the cause. Find the cause first.

Why pavers move

Pavers sit on a bedding layer over a gravel base over soil. When the surface moves, one of those layers moved.

Frost heave. Water in the soil or base freezes and expands. It lifts the pavers above it. In spring the ice melts and the pavers drop, but not always back to where they were. A base that holds water heaves. A base that drains does not.

Settling. The base or the soil under it was not compacted enough. Over a few seasons it packs down and the pavers follow. This often shows up along the house, where backfill from construction was loose.

Washout. Water running under the patio carries sand and fines away. A downspout that dumps beside the patio is the usual cause. The pavers sink where the water travels.

Edge failure. The edge restraint broke, rotted, or was never installed. The outside pavers spread, joints open, and the field loosens.

Roots. A tree root grew under the patio and pushed up a ridge.

Too thin a base. The patio was built on a thin layer of gravel over native soil. Armstrong ground freezes for months. A shallow base in this climate heaves and settles every year.

Look at the pattern of movement. One low spot near a downspout points to washout. A ridge points to a root. A dish shape near the house points to settling. Movement across the whole patio, worse each spring, points to frost and a poor base.

Check the water first

Before you fix the surface, fix the water. Stand outside during a hard rain or run a hose. Watch where the water goes.

Downspouts that empty onto or beside the patio need to be extended well past it. Grading that sends lawn water onto the patio needs to change. A patio that slopes toward the house needs its pitch corrected during the repair. See downspouts and where roof water should go and how to keep a patio from pooling water.

Skip this step and the repair fails the same way.

The small fix: lift and relay

If the base is sound and only a section has moved, the pavers in that area can be lifted and relaid.

The crew marks the area. They pull the pavers with a paver extractor or two flat screwdrivers, working from an open edge or a cut joint. They set the pavers aside in order. Then they look at the bedding layer. A low spot gets more bedding sand, screeded level with the surrounding grade. A high spot gets some removed. If the gravel base under the sand is low, they add gravel and compact it before the sand goes back.

The pavers go back in the same pattern. The crew tamps the surface with a plate compactor over a pad, sweeps in joint sand, and compacts again.

This fix suits a few low pavers at a step, a dip beside a downspout that has been moved, or a settled strip along the house. It does not help if the whole base is bad.

The medium fix: relay a large section

Sometimes half the patio has settled, or the edge has let go along one full side. The crew lifts all the pavers in that section, stacks them, and rebuilds the bedding layer across the whole area. They replace or reset the edge restraint. If the gravel base is thin or uneven, they add and compact it.

Pavers can be reused if they are sound. Some will be stained or chipped. Ask whether the crew can source matching pavers, or plan to use the mismatched ones at the edges or under furniture.

The big fix: rebuild the base

If the patio heaves every winter, settles every summer, and moves across its whole area, the base is wrong. Adding sand to the low spots each year does not end the problem. The fix is to lift every paver, dig out the base, and rebuild it to a spec that suits the soil and the climate.

Signs the base needs rebuilding:

  • Movement is widespread, not local
  • The patio has been repaired before and moved again
  • Digging at the edge shows gravel over bare dirt with no real depth
  • Water sits under the pavers after rain
  • The soil is heavy clay that holds water

A rebuild costs more than a relay but it ends the cycle. How a paver patio base is built for Armstrong winters explains what a sound base looks like. Ask the contractor for the spec and why it suits your soil.

Roots and other odd causes

A root under the patio can be cut if the tree can spare it. Cutting a large root near the trunk can harm or topple the tree. Ask an arborist before the crew cuts. Sometimes the better fix is to reset the pavers over the root with a slight hump and accept it.

A broken irrigation line or a leaking hose bib under a patio causes washout that looks like settling. Turn off the water and watch for a change.

Questions to ask the repair crew

  • What do you think caused the movement, and how do you know?
  • Will you fix the water problem before the surface?
  • Are you relaying on the existing base or rebuilding it?
  • How will you match the finished height to the door and the lawn?
  • What edge restraint will you use, and how is it anchored?
  • Can my pavers be reused, and what if some break?
  • What joint sand will you use?
  • How will you keep it from happening again?

A crew that only talks about adding sand has not looked at the cause. A crew that talks about the base and the water has.

Doing it yourself

A small lift and relay is within reach for a handy owner with a weekend, a level, a rubber mallet, and a bag of bedding sand. Take photos before you lift so you can match the pattern. Rent a plate compactor to finish.

A full base rebuild means excavation, gravel delivery, compaction in layers, and grading for drainage. Most owners hire that out.

What to do next

Walk the patio after the next rain and map where water goes and where the surface has moved. Match the pattern to the causes above. Then call for quotes and ask the questions listed here. The patios and walkways service page covers what a repair or rebuild includes.

Have a yard project in mind?

Send a note about your yard, what you want done, and when.